Station 4

Tubac Fire Station 4 is located at 149 Ruta Camaron, Rio Rico.  This was the second station built on the east side of the Santa Cruz River.  The station is a mirror duplicate of station 3.  This station was built for $2.1 million dollars and went operational in October of 2010.
 

Tubac Fire Station 4